Work out how much concrete to order for a slab, footing, wall, post holes or stairs. Add several pours together, then send the numbers to us with your quote request.

Units

0.00 m³ (0.00 yd³)

Enter your sizes above.

Get a pump quote for this pour

How to use it

Common questions

How much extra concrete should I order?

Most people add 5 to 10%. Use 10% for slabs on uneven ground, footings in dug trenches, or anything you can't measure exactly. Running short mid-pour is far worse than a little left over.

How many bags is that?

A 30 kg bag of concrete mix makes about 0.014 m³, so one cubic metre is roughly 71 bags. Past about half a cubic metre, ready-mix is usually much less work, and a line pump gets it to the forms without wheelbarrows.

Cubic metres or cubic yards?

One cubic yard is about 0.76 m³. Ready-mix plants on the Island quote in cubic metres, so that's the number to give your supplier.

Do you supply the concrete?

No. You order it from your ready-mix supplier and tell them it's being pumped. We bring the pump and line, and coordinate the timing with them.